Method of findingthe dry ingredient quantity of 1 m3
concrete.
Answer Posted / b.subhash
Estimating Quantities of material needed.
1. Calculate the volume of concrete needed.
2. Estimate the total volume of dry material by
multiplying the required volume of concrete by 1.65 to get
the total volume of dry loose material needed (this includes
10% extra to compensate for losses).
3. Add the numbers in the volumetric proportion that you
will use to get a relative total. This will allow you later
to compute fractions of the total needed for each
ingredient. (i.e. 1:2:4 = 7).
4. Determine the required volume of cement, sand and
gravel by multiplying the total volume of dry material (Step
2) by each components fraction of the total mix volume (Step
3) i.e. the total amount cement needed = volume of dry
materials * 1/7.
5. Calculate the number of bags of concrete by dividing
the required volume of cement by the unit volume per bag of
cement (0.0332 m3 per 50 kg bag of cement or 1 ft3 per 94 lb
bag).
For example, for a 2 m x 2 m x 10 cm thick pump pad:
1. Required volume of concrete = 0.40 m3
2. Estimated volume of dry material = 0.4 x 1.65 = 0.66 m3
3. Mix totals = 1+2+4 = 7 (1:2:4 cement:sand:gravel)
4. Ingredient Volumes: 0.66 x 1/7 = .094 m3 cement
0.66 x 2/7 = .188 m3 sand
0.66 x 4/7 = .378 m3 gravel
5. # Bags of cement: 0.094 m3 cement / .0332 m3 per 50 Kg bag
= 2.83 bags of cement (use three bags)
| Is This Answer Correct ? | 158 Yes | 44 No |
Post New Answer View All Answers
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
natucher of concrete &type of concrete?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
what is polity
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
What is difference between combin footing & rapt footing
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
Define Who designed the city of Washington DC?
what is the price of a cubic meter of concrete on international market?
what is concrete canvas?
What is the significance of cost estimate knowledge for an architect?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard