A power unit is there by the bank of the river of 900 mtr
width. a cable is made from power unit to power a plant
opposite to that of the river and 3000 mtr away from the
power unit. The cost of the cable bellows water Rs5 / mtr
and cost of cable on the bank is Rs 4/ mtr. Find the total
of laying the cable.
Answers were Sorted based on User's Feedback
Ben can have a piece of work done in 8 days, Joe can work three times faster than the Ben, Ram can work five times faster than Ben. How many days will they take to do the work together ?
All birds are animals. All animals are four legged. Implications a. All animals which are four legged are birds. b. All birds are four legged c. Some birds are four legged d. Some birds are animals but not four legged.
A clock is late by 1 minute 27 seconds in a month. Then how much will it be late in 1 day?
0 Answers BPCL Bharat Petroleum, Sonata,
pls send me andhra bank clerk model papers&syllabus
in an cricket match the team has to score 8 runs from 3 balls,the crickets on the grease were at a:92;b:96,they must complete hundred in the match how?
Editor:magazine ::
Suggest me good book for preparation of Assistant Administrative Officer (AAO)
Find the physical quantity represented by MOMENTUM * VELOCITY] / [LENGTH * ACCELERATION]?
1. 6 workers can complete a work in 48hrs, how much time it will take with 5 workers? 2. In 5 workers one has taken break for 8hrs how much time they will take to finish the work?
Sum of two consecutive nos is 55, larger one is?
3 Answers Geometric Software, Infosys,
rrb second stage written exam in aptitude test model papers
During a given week A programmer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.