A power unit is there by the bank of the river of 900 mtr
width. a cable is made from power unit to power a plant
opposite to that of the river and 3000 mtr away from the
power unit. The cost of the cable bellows water Rs5 / mtr
and cost of cable on the bank is Rs 4/ mtr. Find the total
of laying the cable.

Answers were Sorted based on User's Feedback



A power unit is there by the bank of the river of 900 mtr width. a cable is made from power unit to..

Answer / mohamed yousuf

=2100*4+900*5
=8400+4500
=12900

Is This Answer Correct ?    29 Yes 12 No

A power unit is there by the bank of the river of 900 mtr width. a cable is made from power unit to..

Answer / anjani

12900

Is This Answer Correct ?    12 Yes 6 No

A power unit is there by the bank of the river of 900 mtr width. a cable is made from power unit to..

Answer / arnav

12900

Is This Answer Correct ?    9 Yes 4 No

A power unit is there by the bank of the river of 900 mtr width. a cable is made from power unit to..

Answer / karthika

12,900

Is This Answer Correct ?    4 Yes 1 No

A power unit is there by the bank of the river of 900 mtr width. a cable is made from power unit to..

Answer / aswathy

(900*5)+(3000-900)*4
=4500+8400
=12,900

Is This Answer Correct ?    4 Yes 1 No

A power unit is there by the bank of the river of 900 mtr width. a cable is made from power unit to..

Answer / prateek

=2100*5+ 900*4
=10500+3600
=14100 ans

Is This Answer Correct ?    2 Yes 11 No

Post New Answer

More General Aptitude Interview Questions

Ben can have a piece of work done in 8 days, Joe can work three times faster than the Ben, Ram can work five times faster than Ben. How many days will they take to do the work together ?

3 Answers  


All birds are animals. All animals are four legged. Implications a. All animals which are four legged are birds. b. All birds are four legged c. Some birds are four legged d. Some birds are animals but not four legged.

0 Answers   Amdocs,


A clock is late by 1 minute 27 seconds in a month. Then how much will it be late in 1 day?

0 Answers   BPCL Bharat Petroleum, Sonata,


pls send me andhra bank clerk model papers&syllabus

0 Answers   ME,


in an cricket match the team has to score 8 runs from 3 balls,the crickets on the grease were at a:92;b:96,they must complete hundred in the match how?

17 Answers   Infosys,






Editor:magazine ::

0 Answers  


Suggest me good book for preparation of Assistant Administrative Officer (AAO)

1 Answers  


Find the physical quantity represented by MOMENTUM * VELOCITY] / [LENGTH * ACCELERATION]?

0 Answers   Accenture,


1. 6 workers can complete a work in 48hrs, how much time it will take with 5 workers? 2. In 5 workers one has taken break for 8hrs how much time they will take to finish the work?

5 Answers   Franklin Templeton,


Sum of two consecutive nos is 55, larger one is?

3 Answers   Geometric Software, Infosys,


rrb second stage written exam in aptitude test model papers

0 Answers   RRB,


During a given week A programmer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.

0 Answers  


Categories