A and B together can do a piece of work in 12 days, B and C
together in 15 days and C and A together in 20 days. In how
many days, can A, B and C together do it ?
(a) 5 days
(b) 10 days
(c) 24 days
(d) 30 days
Answers were Sorted based on User's Feedback
Answer / beda
2(A+B+C)=1/12 + 1/15 +1/20=1/5 ( in one day)
(A +B +C) = 1/10 in one day
Therefore A +B +C can complete in 10 days
| Is This Answer Correct ? | 6 Yes | 2 No |
Shahjahan built the Moti Masjid at (a) Delhi (b) Jaipur (c) Agra (d) Amarkot
Hay fever is a sign of (a) Malnutrition (b) Allergy (c) Old age (d) Over work
what is the present bank rate of sbi
3 Answers State Bank Of India SBI,
Which of the following rights does not belong to the Right to Freedom? (a) To assemble peacefully (b) To form associations or unions (c) To establish denominational institutions (d) To reside in any part of India
Who was the first Indian actress to receive the Padma Shri award ?
What is the new name of Abyssinia ?
The instrument that measures and records the relative humadity of air is (a) Hydrometer (b) Hygrometer (c) Lactometer (d) Barometer
A mixture of 30 litres contains milk and water in the ratio 7 : 3. How much water should be added to it so that the ratio of milk and water becomes 3 : 7 ? (a) 40 litres (b) 49 litres (c) 56 litres (d) 63 litres
From where the India?s first private telephone service was launched in 1998 ?
The measures of the angles of a triangle are in the ratio 2 : 7 : 11. Measures of the angles are (a) 160, 560, 880 (b) 180, 630, 990 (c) 200, 700, 900 (d) 250, 1750, 1050
The present name of Kamarupa is ___________?,
What is humus ?