A works thrice as much as B. If A takes 60 days less than B to do a work then find the number of days it would take to complete the work if both work together?
No Answer is Posted For this Question
Be the First to Post Answer
Three men A, B, C plays Cards. If one loses the game he have to give Rs.3. If he wins the game he will gain Rs.6. If A has won 3 Games, B loses Rs.3, C wins Rs.12.What is the total no. of games played?
10 Answers Accenture, College School Exams Tests, CTS,
if on a salary s per month, a tax of x% of the salary and another of r% of the salary is deducted what is the income.
0 is represented by * 1 by $ 4 is $** 3 is ** wat wud be the value of 340 - 32
there are 3 door in a closed room.Behind two door there is beast and behind one is a beauty. and you know that one of the door which contain beast.Now find the maximum chance of you win ie getting the beauty.
The size of the bucket is N kb. The bucket fills at the rate of 0.1 kb per millisecond. A programmer sends a program to receiver. There it waits for 10 milliseconds. And response will be back to programmer in 20 milliseconds. How much time the program takes to get a response back to the programmer, after it is sent?
1 Answers Accenture, BSNL, TCS,
Complete the sequence 9,10,11,13,15, __, 21,28.
The Bulls, Pacers, Lakers and Jazz ran for a contest. Anup, Sujit, John made the following statements regarding results. � Anup said either Bulls or Jazz will definitely win � Sujit said he is confident that Bulls will not win � John said he is confident that neither Jazz nor Lakers will win When the result cameit was found that only one of the above three had made a correct statement. Who has made the correct statement and who has won the contest.
i am preparing for SBI clerical exam and also for oriental bank of commerce .. i need previous exam question paper for last 10 years .. pls can you send it to me by email id .. pls help me
0 Answers State Bank Of India SBI,
If ABC = C^C^C and CAB = D^D^D Then find D^3 / B^3 1). 4 2). 8 3). 5/2 4). 7/2
A man ate 100 bananas in five days, each day eating 6 more than the previous day. How many bananas did he eat on the first day?
there is a matrix N x N .Its elements consist of either value =1 or value=0. If there is a any zero in the row, then the output matrix should have all zeroes in that row. If there is a single zero in any column then that column should have all zeroes n the output matrix. write the function to perform these operations. i want a solution in c/c++ language
A can do a piece of work in 30 days, which B can do in 20 days. Both started the work but A left 5 days before the completion of the work. It took how many days to complete the work?