A team P of 20 engineers can complete a task in 32 days. Another team Q of 16 engineers can complete the same task in 30 days. Then the ratio of working capacity of 1 member of P to that of a member of Q is:
No Answer is Posted For this Question
Be the First to Post Answer
There are 40 seats in a bus. People agree to share the money for the number of seats. The total money comes to 70.37. How many seats were free?
Machines X & Machine Y produces 8000 articles in 4 and 8 hrs respectively. If they work alternately for one hr each, X starting first, in what time 10000 articles can be produced?
In Madras, temperature at noon varies according to -t^2/2 + 8t + 3, where t is elapsed time. Find how much temperature more or less in 4pm to 9pm.
Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18 9 3
A certain type of mixture is prepared by mixing brand A at Rs.9 a kg. with brand B at Rs.4 a kg. If the mixture is worth Rs.7 a kg., how many kgs. of brand A are needed to make 40kgs. of the mixture?
At six o'clock the wall clock struck 6 times . Checking with my watch , I noticed that the time between the first & last strokes was 30 seconds . How long will the clock take to stike 12 at mid night
When an object like cube or sphere is seen along x,y,z,axes we get the same.Apart from these suggest another which has similar characteristics?
2 Answers Aspire, Geometric Software, Neilsoft,
I am at my paying guest accommodation if I am not in the office. a) I am at my paying guest accommodation. b) I am at my office. c) I am not at paying guest accommodation. d) I am not at my office. A) cb B) ad C) cd D) None of the options
If x + 8y = 20 and x = -3y, then y =
Three men A, B, C can complete a work separately in some specified days (May be 8, 7, 6).If they do the work together by alternate days. Then how many days need to complete the work?
The hourly declination of moon for a given day is as follows: Hour Declination 2 8o 6’ 43.5” 3 7o 53’ 6.1” Find the declination of the moon at hour 4. (a) 8o 22’ 13.5” (b) 7o 56’ 54.5” (c) 9o 46’ 33.5”(d) 7o16’ 12.5” (e) 7o 39’ 28.7”///ANS:E
A store owner is packing small radios into larger boxes that measure 25 in. by 42 in. by 60 in. If the measurement of each radio is 7 in. by 6 in. by 5 in., then how many radios can be placed in the box?