2 persons can finish a job in 8 days. First person alone can finish the work in 24 days. How many days does the second person take to finish the job?
No Answer is Posted For this Question
Be the First to Post Answer
A TV set, with a marked price of Rs.14,000 was sold for Rs.11,214 after two successive discounts. If the first discount was 11%, what was the second discount?
Find the ratio of the areas of the regular hexagons inscribed in and circumscribed around a circle of radius 10cm.
Find odd one cat,dog,rabbit,hamster,elk.
a sum 's' is devided into 4 parts.second person gets Rs 10 more than first.3rd person is Rs 10 more than second, 4th is 10 more than 3rd. how much amount do 1st person get?
22 Answers Elin, Infosys, Wipro,
A right circular cylinder and a cone are there. Base radius of cone is equal to radius of cylinder. What is the ratio of height to slant side if their volume are the same?
If y/x = 1/3 and x + 2y = 10, then x is
A shopkeeper allows 10% discount on the price of an article and sells it for Rs. 7,600. What is the market price of the article ? (a) Rs. 8,250 (b) Rs. 8,500 (c) Rs. 8,540 (d) Rs. 8,415 (e) None of these
f(X)= f(X-1)+f(X-2) FOR X>1 THEN X= ?
If all the natural numbers from 256 to 400 are written side by side to each other, a large natural number is obtained. How many times 6 appears in this large natural number?
I was born on October 17, 1927. How old I was on Jan. 26, 1978?
14 Answers Rourkela Steel Plant, Vizag Steel,
Find the next letter in the series O,T,T,F,F,S,S--
How many mashes are there in 1 square meter of wire gauge if each mesh is 8mm long and 5mm wide ?