A can do a piece of work in 20 days, which B can do in 12 days. In 9 days B does ¾ of the work. How many days will A take to finish the remaining work?
No Answer is Posted For this Question
Be the First to Post Answer
consider expression 'ab' . what happens when 'a' is divided by 'c' &'b' is multiplied by 'c'.
how many types of indexing?
Plz send me the solved sample question papers of state bank of india
given 2 cubes,arrange any number from 0-9 so dat wen put together whole month dates should appear.
find missing no 15 13 12 12 11 11 ?
The houses are numbered 1,2,3,? and reach the end of the street and backtracks toward s the starting point. The house numbered 10 is opposite to 23. there are even no of houses. Find the total no of houses.
The hour hand lies between 3 and 4. Tthe difference between hour and minute hand is 50 degree.What are the two possible timings?
What is the perimeter of the quadrilateral?
in a company 30% are supervisors and 40% employees are male if 60% of supervisors are male. what is the probability that a randomly choosen employee is a male or female?
Make a square by drawing only one line
0 Answers BPCL Bharat Petroleum, Sonata,
What are ActiveX Controls
In any place there are 9 Cottage. Each to a Cottage Mohan Tanya and Roma do not want to live in end Row. Babu and Mohan must not have any body adjacent. Only on empty Cottage between Mohan and Roma. Chander is adjacent to both Jayanti and Roma. Tanya next to the cottage at the begnings. 1. Who has empty Cottage both side. (a) Roma (b) Babu (c) Mohan (d) Tanya 2. Who is in 3rd Cottage ? (a) Jyoti (b) Chandar (c) No body (d) Roma 3. what Cottage empty (a) 1,6,8 (b) 1,5,8 (c) 4,5,6 (d) 5,6,8 4. Maximum no. of consecutive Cottage that are (a) 0 (b) 2 (c) 3 (d) 4 5. we are writing code word PEOPLE to PLPEOEE than how to write TREND (a) TREDN (b) DNERT (c) NDETR (d) TNERD
3 Answers AON, Aon Hewitt, Hewitt,