Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


In a class 80% have passed english,70% passed hindi, 10%
didnot passed either.If 144 students passed both. What is the
total strength of the class

Answers were Sorted based on User's Feedback



In a class 80% have passed english,70% passed hindi, 10% didnot passed either.If 144 students pass..

Answer / ravi

union defined as U
intersection defined as n
A U B = 144
A + B - (A n B)= (A U B)
0.8x +0.7x -144 = x
1.5x - 144 = x
1.5x - x =144
0.5x = 144
x = 288

So, total strength is 288

Is This Answer Correct ?    11 Yes 4 No

In a class 80% have passed english,70% passed hindi, 10% didnot passed either.If 144 students pass..

Answer / wareagle

Forget the 80% and the 70%. It is there to confuse you.

10% of class did not pass any test. 144 students passed both tests.
There for 90% must = 144 students. 10% + 90% = 100%.
Therefore 10% + 144 = 100%. So 144 = 90%. or 100% = 144/0.90 = 160

Is This Answer Correct ?    5 Yes 6 No

Post New Answer

More General Aptitude Interview Questions

A man has 2 cows of total cost 200 rupees. He sold them for 210. For 1 cow he had a profit of 10% and for the other he had a loss of 10%. What is the price of each cow?

0 Answers   Huawei,


1,40,00,000 pencils are put up straight. all the pencils are of length range 3 to 6 inches. 80% of the pencils have average of five inches. so the find out the total length spanned by the penciles.

0 Answers   Wipro,


If a ball falls from 16 feet takes 4 seconds. How much time it will take when falls fron 64 feets.

0 Answers   Wipro,


Q) Susan wants to put up fencing around three sides of her rectangular yard and leave a side of 20 feet unfenced. If the yard has an area of 680 square feet, how many feet of fencing does she need? a) 38 b) 44 c) 72 d) 88 e) 97

6 Answers   GMAT, Infosys,


Two people X & Y walk on the wall of a go down in opposite direction. They meet at a point on one side and then go ahead. X after walking for some time, walks in opposite direction for 15 mtrs.Then again he turns back and walks in the original direction. What distance did Y walk before they met again, if X walks 11 mtrs by the time Y walks 8 mtrs.

0 Answers   Infosys,


What s de answer for this question : Three independent mechanisms A, B and C have been incorporated for power saving in a plant producing respectively 30%, 40% and 10% efficiency. Assuming that they operate independently, what is the net power efficiency achieved. (a) 62.2% (b) 68% (c) 61% (d) 64% (e) 56%

5 Answers   TCS,


A and B combinely can do a work in 4 days. If A alone can do a piece of work 6 days. In how many days B alone can do? a) 8 days b) 6 days c)10 days d) 12 days

15 Answers   Wipro,


A man walks from 9.15 to 5.15 from monday to friday and 9.00 to 12.00 on saturday.Each day 0.45 min lunch. How much time he walks in a week

11 Answers   CitiGroup, Ramco,


A & B are playing a game .There are 8 oranges in a row on the table.one Player can take 1-4 oranges in a pick (a maximum of 4),one who picks the last orange wins the game.'A' plays first How many oranges should he pick first time inorder to win the game.

0 Answers   Accenture,


Complete the series 2, 7, 24, 77,__

9 Answers   Accenture, BSNL, TCS,


A telephone cable is to be run from a junction point on the bank of a river 900 meters wide to an office that is located 3000 meters downstream on the opposite bank. If the cost of laying cable under water is Rs. 5 per meter and that of laying overhead on land is Rs. 4 per meter, find the point downstream where the cable is to cut across the river. (a) 450 (b) 1800 (c) 2800 (d) 2100 (e) 2700

7 Answers   TCS,


electrical question in diploma level

0 Answers   RRB,


Categories