From 7:00 AM to 11:00 AM it rained 2.25 inches. At 11:00 AM
the rain increased to fall at a rate of 1.25 in. every two
hours. How many inches of rain landed on the ground by 5:00
PM?
a) 7
b) 9.75
c) 6
d) 3.25
e) 7.125
Answers were Sorted based on User's Feedback
Answer / master mandar
it's 6 inch 7-11 am it is 2.25 & from 11 to 5 pm it's total
3.75 so ans is 6 inch= (2.25+3.75)
Is This Answer Correct ? | 18 Yes | 3 No |
please send general aptitude questions with their answers
0 Answers BPCL Bharat Petroleum, HPCL,
If the vertex (5,7) is placed in the memory. First vertex (1,1) ?s address is 1245 and then address of (5,7) is ----------
0 Answers Accenture, BSNL, TCS,
A solid cube of each side 8cms, has been painted red , blue , black on pairs of opposite faces.It is then cut into cubical blocks of each side 2cms.
Find the product of the prime numbers between 1-20
who are the noble prize winners for 2008
A worker pay Rs20 a day ,he works 1,1/3,2/3,1/8,3/4 in a week.What is the total amount paid to the worker.
A dealer sells 3 sets at Rs.2400 each ,one at 20% gain and the other at 20% loss. what is the overall gain or loss.
in some game 139 members have participated every time one fellow will get bye what is the number of matches to choose the champion to be held?
2 Answers Accenture, CTS, TCS,
Imagine 4 persons A,B,C,D.(It is a strength determining game). A found it hard,but could pull 'c' and 'd' to his side. AC and BD pairs on opposite sides found themselves equally balanced. When A and B exchanged their positions to form pairs AD and BC ,BC pair could win and pull AD to their side.Order the 4 persons in Ascending order according to their strengths.
A man walks around a rectangle. The time taken by him in travelling the length is twice as taken in travelling the breadth of the rectangle. If the perimeter of the rectangle is 300 mts, what is the area of the rectangle?
2. Why would you choose a database system instead of simply storing data in operating system files? Give and explain advantages of using DBMS.
84 mens complete the work in 17 day. how much time 119 person take to complete the work.