whenever i run the programe transfered to GL from payables
that programe is shown with warning error and not
transferred entries to GL
Answer / anil s
First of all the warning error need to be known if it WACO
(way after cut off) then ignore it as the current period
might not be set in the constant. A/P constant should be set.
In JDE the error and resolution is been screened in red so
that after reading it try to resolve
Is This Answer Correct ? | 6 Yes | 0 No |
Why use zero amount payment? what is setup and which condition use ?
You created a set of book , where you will attach this SOB in AP?
11 Answers HCL, IBM, TCS,
whichever documents prepaired by the FUNCTIONAL CONSULTANT while implementing project by using AIM.
What are the types of PO?
What is automation of accounts payable activities (evaluated receipt settlement)?
What is the Functionality of Oracle Applications E-Business Suite?
What is meant by quotation and quotation analysis?
Can i assign a supplier type of bank account to more than one supplier ?
In Subinventories Form, how to enable the Locator Control. A message displayed when changing the drop down list "FRM-40200: Field is protected against update.
How the system will know which entry come from which operating unit. Example A,B and C is a operating unit and bymistake we posted one entry in Operating Organisation A which belongs to actually Operating Org. B. How the system will understand that this entry Posted in Operating Unit A.
What are the different types of Value sets (or) Validation types ?
Can I do a payment of 50 bills on a post date. If yes, then how?