How to construct BUILDINGS in a very busy and very narrow roads with out causing much disturbance to others?
No Answer is Posted For this Question
Be the First to Post Answer
What is the more accurate formula to convert wet concrete to dry aggregate instead of the 54% method?
i wan job in architectural degsiner
how much steel is required for 40*35 ft roof slab41/2" thick.what is the spacing from bar to bar.
3. Assume a building having three floor and a lift, the lift has the following buttons: a. G (for ground floor) b. 1 (for first floor) c. 2 (for the second floor) d. 3 (for the 3rd floor) e. Stop (Stop button to stop the lift in emergency) Assume currently the lift is in the ground floor; write an algorithm for the lift to work.
Have you heard about any earth bag project implemented in Poalnd ? I have some doubts if our climate is suitable for this kind of system.
Is there any difference between interrupt and acknowledgment?
give maaterial requesion for 6x3x1 Mcube machnine foundation
what caused you to decide become an architect?what skills do you bring to this job?
which shape that can't draw in 3 dimension without shading the shape.CONDITION without shading.
i am looking for Final year Architecture Designer or any home based project worker in chennai. contact 9500092822
how i calculate steel required for r.c.c1400sqr feet slab ,what is the thickness of steel bar.
Define frieze?