Which of the following techniques would provide the BEST
assurance that the estimate of program development effort is
reliable?

A. Function point analysis

B. Estimates by business area

C. A computer-based project schedule

D. An estimate by experienced programmer



Which of the following techniques would provide the BEST assurance that the estimate of program dev..

Answer / guest

Answer: A

The use of estimation techniques, such as function point
analysis or lines of code estimation, provide a firm basis
for estimation, particularly if supported by historic
records of past activities. An estimate by an experienced
programmer would be the next best option. However, it may be
individualistic and unless there is a standard approach
adopted by the programmer, the estimate can vary
considerably from one programmer to another. Standard
project scheduling tools assist in working out the overall
project schedule, but are reliant on the quality of
estimation of individual tasks. They do not give an estimate
of actual development cost.

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

IS auditors are MOST likely to perform compliance tests of internal controls if, after their initial evaluation of the controls, they conclude that: A. a substantive test would be too costly. B. the control environment is poor. C. inherent risk is low. D. control risks are within the acceptable limits.

2 Answers  


Which of the following is a threat? A. Lack of security B. Loss of goodwill C. Power outage D. Information services

1 Answers  


When conducting a review of business process re-engineering, an IS auditor found that a key preventive control had been removed. In this case, the IS auditor should: A. inform management of the finding and determine if management is willing to accept the potential material risk of not having that preventing control. B. determine if a detective control has replaced the preventive control during the process and if so, not report the removal of the preventive control. C. recommend that this and all control procedures that existed before the process was reengineered be included in the new process. D. develop a continuous audit approach to monitor the effects of the removal of the preventive control.

2 Answers  


Which of the following provides the GREATEST assurance of message authenticity? A. The pre-hash code is derived mathematically from the message being sent. B. The pre-hash code is encrypted using the sender's private key. C. Encryption of the pre-hash code and the message using the secret key. D. Sender attains the recipient's public key and verifies the authenticity of its digital certificate with a certificate authority.

1 Answers  


With reference to the risk management process, which of the following statements is correct? A. Vulnerabilities can be exploited by a threat. B. Vulnerabilities are events with the potential to cause harm to IS resources. C. Vulnerability exists because of threats associated with use of information resources. D. Lack of user knowledge is an example of a threat.

1 Answers  






The MOST important responsibility of a data security officer in an organization is: A. recommending and monitoring data security policies. B. promoting security awareness within the organization. C. establishing procedures for IT security policies. D. administering physical and logical access controls.

1 Answers  


Which of the following sampling methods is MOST useful when testing for compliance? A. Attribute sampling B. Variable sampling C. Stratified mean per unit D. Difference estimation

1 Answers  


Which of the following is MOST effective in controlling application maintenance? A. Informing users of the status of changes B. Establishing priorities on program changes C. Obtaining user approval of program changes D. Requiring documented user specifications for changes

1 Answers  


Which of the following is MOST likely to result from a business process reengineering (BPR) project? A. An increased number of people using technology B. Significant cost savings, through a reduction in the complexity of information technology C. A weaker organizational structures and less accountability D. Increased information protection (IP) risk will increase

1 Answers  


Facilitating telecommunications continuity by providing redundant combinations of local carrier T-1 lines, microwaves and/or coaxial cables to access the local communication loop is: A. last mile circuit protection. B. long haul network diversity. C. diverse routing. D. alternative routing.

1 Answers  


An IS auditor has just completed a review of an organization that has a mainframe and a client-server environment where all production data reside. Which of the following weaknesses would be considered the MOST serious? A. The security officer also serves as the database administrator (DBA.) B. Password controls are not administered over the client/server environment. C. There is no business continuity plan for the mainframe system?s non-critical applications. D. Most LANs do not back up file server fixed disks regularly.

1 Answers  


Losses can be minimized MOST effectively by using outside storage facilities to do which of the following? A. Provide current, critical information in backup files B. Ensure that current documentation is maintained at the backup facility C. Test backup hardware D. Train personnel in backup procedures

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)