A universal serial bus (USB) port:

A. connects the network without a network card.

B. connects the network with an Ethernet adapter.

C. replaces all existing connections.

D. connects the monitor.



A universal serial bus (USB) port: A. connects the network without a network card. B. connects..

Answer / guest

Answer: B

The USB port connects the network without having to install
a separate network interface card inside a computer by using
a USB Ethernet adapter.

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

IS auditors are MOST likely to perform compliance tests of internal controls if, after their initial evaluation of the controls, they conclude that: A. a substantive test would be too costly. B. the control environment is poor. C. inherent risk is low. D. control risks are within the acceptable limits.

2 Answers  


Controls designed to ensure that unauthorized changes are not made to information residing in a computer file are known as: A. data security controls. B. implementation controls. C. program security controls. D. computer operations controls.

1 Answers  


When implementing continuous monitoring systems an IS auditor's first step is to identify: A. reasonable target thresholds. B. high-risk areas within the organization. C. the location and format of output files. D. applications that provide the highest potential payback.

1 Answers  


Which of the following would be the BEST method for ensuring that critical fields in a master record have been updated properly? A. Field checks B. Control totals C. Reasonableness checks D. A before-and-after maintenance report

2 Answers  


Which of the following normally would be the MOST reliable evidence for an auditor? A. A confirmation letter received from a third party verifying an account balance B. Assurance from line management that an application is working as designed C. Trend data obtained from World Wide Web (Internet) sources D. Ratio analysis developed by the IS auditor from reports supplied by line management

1 Answers  






When two or more systems are integrated, input/output controls must be reviewed by the IS auditor in the: A. systems receiving the output of other systems. B. systems sending output to other systems. C. systems sending and receiving data. D. interfaces between the two systems.

1 Answers  


Which of the following is the FIRST step in a business process reengineering (BPR) project? A. Defining the areas to be reviewed B. Developing a project plan C. Understanding the process under review D. Reengineering and streamlining the process under review

1 Answers  


Which of the following is an implementation risk within the process of decision support systems? A. Management control B. Semistructured dimensions C. Inability to specify purpose and usage patterns D. Changes in decision processes

1 Answers  


Which of the following is a measure of the size of an information system based on the number and complexity of a system's inputs, outputs and files? A. Program evaluation review technique (PERT) B. Rapid application development (RAD) C. Function point analysis (FPA) D. Critical path method (CPM)

1 Answers  


When a systems development life cycle (SDLC) methodology is inadequate, the MOST serious immediate risk is that the new system will: A. be completed late. B. exceed the cost estimates. C. not meet business and user needs. D. be incompatible with existing systems.

1 Answers  


When reviewing a system development project at the project initiation stage, an IS auditor finds that the project team is following the organization's quality manual. To meet critical deadlines the project team proposes to fast track the validation and verification processes, commencing some elements before the previous deliverable is signed off. Under these circumstances, the IS auditor would MOST likely: A. report this as a critical finding to senior management. B. accept that different quality processes can be adopted for each project. C. report to IS management the team's failure to follow quality procedures. D. report the risks associated with fast tracking to the project steering committee.

1 Answers  


A decision support system (DSS): A. is aimed at solving highly structured problems. B. combines the use of models with nontraditional data access and retrieval functions. C. emphasizes flexibility in the decision making approach of users. D. supports only structured decision-making tasks.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)