Which of the following can be used to verify output results
and control totals by matching them against the input data
and control totals?

A. Batch header forms

B. Batch balancing

C. Data conversion error corrections

D. Access controls over print spools



Which of the following can be used to verify output results and control totals by matching them aga..

Answer / guest

Answer: B

"Batch balancing is used to verify output results and
control totals by matching them against the input data and
control totals. Batch header forms control data preparation

data conversion error corrections correct errors that occur
due to duplication of transactions and inaccurate data entry

and access controls over print spools prevent reports from
being accidentally deleted form print spools or directed to
a different printer."

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Which of the following is the primary purpose for conducting parallel testing? A. To determine if the system is cost-effective. B. To enable comprehensive unit and system testing. C. To highlight errors in the program interfaces with files. D. To ensure the new system meets user requirements.

1 Answers  


Which of the following processes describes risk assessment? Risk assessment is: A. subjective. B. objective. C. mathematical. D. statistical.

1 Answers  


Transmitting redundant information with each character or frame to facilitate detection and correction of errors is called: A. feedback error control. B. block sum check. C. forward error control. D. cyclic redundancy check.

1 Answers  


An IS auditor performing an audit of the company's IS strategy would be LEAST likely to: A. assess IS security procedures. B. review both short- and long-term IS strategies. C. interview appropriate corporate management personnel. D. ensure that the external environment has been considered.

1 Answers  


One of the purposes of library control software is to allow: A. programmers access to production source and object libraries. B. batch program updating. C. operators to update the control library with the production version before testing is completed. D. read-only access to source code.

2 Answers  






In reviewing the IS short-range (tactical) plan, the IS auditor should determine whether: A. there is an integration of IS and business staffs within projects. B. there is a clear definition of the IS mission and vision. C. there is a strategic information technology planning methodology in place. D. the plan correlates business objectives to IS goals and objectives.

1 Answers  


During an implementation review of a multiuser distributed application, the IS auditor finds minor weaknesses in three areas-the initial setting of parameters is improperly installed, weak passwords are being used and some vital reports are not being checked properly. While preparing the audit report, the IS auditor should: A. record the observations separately with the impact of each of them marked against each respective finding. B. advise the manager of probable risks without recording the observations, as the control weaknesses are minor ones. C. record the observations and the risk arising from the collective weaknesses. D. apprise the departmental heads concerned with each observation and properly document it in the report.

1 Answers  


Which of the following is a control over component communication failure/errors? A. Restricting operator access and maintaining audit trails B. Monitoring and reviewing system engineering activity C. Providing network redundancy D. Establishing physical barriers to the data transmitted over the network

1 Answers  


An IS auditor is reviewing the change management process for an enterprise resource planning (ERP) application. Which of the following is the BEST method for testing program changes? A. Select a sample of change tickets and review them for authorization. B. Perform a walk-through by tracing a program change from start to finish. C. Trace a sample of modified programs to supporting change tickets. D. Use query software to analyze all change tickets for missing fields.

2 Answers  


Which of the following is the basic objective of a control self-assessment program?

4 Answers  


A critical function of a firewall is to act as a: A. special router that connects the Internet to a LAN. B. device for preventing authorized users from accessing the LAN. C. server used to connect authorized users to private trusted network resources. D. proxy server to increase the speed of access to authorized users.

2 Answers  


When a systems development life cycle (SDLC) methodology is inadequate, the MOST serious immediate risk is that the new system will: A. be completed late. B. exceed the cost estimates. C. not meet business and user needs. D. be incompatible with existing systems.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)