Which of the following activities should the business
continuity manager perform FIRST after the replacement of
hardware at the primary information processing facility?

A. Verify compatibility with the hot site.

B. Review the implementation report.

C. Perform a walk-through of the DRP.

D. Update the IS assets inventory.



Which of the following activities should the business continuity manager perform FIRST after the re..

Answer / guest

Answer: D

An IS assets inventory is the basic input for the business
continuity/disaster recovery plan, and the plan must be
updated to reflect changes in the IS infrastructure. The
other choices are procedures required to update the disaster
recovery plan after having updated the required assets
inventory.

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

A referential integrity constraint consists of: A. ensuring the integrity of transaction processing. B. ensuring that data are updated through triggers. C. ensuring controlled user updates to database. D. rules for designing tables and queries.

1 Answers  


The difference between a vulnerability assessment and a penetration test is that a vulnerability assessment: A. searches and checks the infrastructure to detect vulnerabilities, whereas penetration testing intends to exploit the vulnerabilities to probe the damage that could result from the vulnerabilities. B. and penetration tests are different names for the same activity. C. is executed by automated tools, whereas penetration testing is a totally manual process. D. is executed by commercial tools, whereas penetration testing is executed by public processes.

1 Answers  


Which of the following would enable an enterprise to provide access to its intranet (i.e., extranet) across the Internet to its business partners? A. Virtual private network B. Client-server C. Dial-in access D. Network service provider

1 Answers  


Which of the following access control functions is LEAST likely to be performed by a database management system (DBMS) software package? A. User access to field data B. User sign-on at the network level C. User authentication at the program level D. User authentication at the transaction level

1 Answers  


Which of the following should concern an IS auditor when reviewing security in a client-server environment? A. Data is protected by an encryption technique. B. Diskless workstations prevent unauthorized access. C. Ability of users to access and modify the database directly. D. Disabling floppy drives on the users machines.

1 Answers  






A retail company recently installed data warehousing client software at geographically diverse sites. Due to time zone differences between the sites, updates to the warehouse are not synchronized. Which of the following will be affected the MOST? A. Data availability B. Data completeness C. Data redundancy D. Data inaccuracy

1 Answers  


At the end of a simulation of an operational contingency test, the IS auditor performed a review of the recovery process. The IS auditor concluded that the recovery took more than the critical time frame allows. Which of the following actions should the auditor recommend? A. Widen the physical capacity to accomplish better mobility in a shorter time. B. Shorten the distance to reach the hot site. C. Perform an integral review of the recovery tasks. D. Increase the number of human resources involved in the recovery process.

1 Answers  


When developing a risk management program, the FIRST activity to be performed is a/an: A. threats assessment. B. classification of data. C. inventory of assets. D. criticality analysis.

1 Answers  


The purpose of debugging programs is to: A. generate random data that can be used to test programs before implementing them. B. protect valid changes from being overwritten by other changes during programming. C. define the program development and maintenance costs to be include in the feasibility study. D. ensure that abnormal terminations and coding flaws are detected and corrected.

1 Answers  


An IS auditor reviewing back-up procedures for software need only determine that: A. object code libraries are backed up. B. source code libraries are backed up. C. both object and source codes libraries are backed up. D. program patches are maintained at the originating site.

1 Answers  


Which of the following types of data validation editing checks is used to determine if a field contains data, and not zeros or blanks? A. Check digit B. Existence check C. Completeness check D. Reasonableness check

1 Answers   CISA,


In a system development project the purpose of the program and procedure development phase is to: A. prepare, test and document all programs and manual procedures. B. document a business or system problem to a level at which management can select a solution. C. prepare a high-level design of a proposed system solution and present reasons for adopting a solution. D. expand the general design of an approved solution so that program and procedure writing can begin.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)