Which of the following hardware devices relieves the central
computer from performing network control, format conversion
and message handling tasks?

A. Spool

B. Cluster controller

C. Protocol converter

D. Front end processor



Which of the following hardware devices relieves the central computer from performing network contr..

Answer / guest

Answer: D

A front-end processor is a hardware device that connects all
communication lines to a central computer to relieve the
central computer.

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Creation of an electronic signature: A. encrypts the message. B. verifies where the message came from. C. cannot be compromised when using a private key. D. cannot be used with e-mail systems.

1 Answers  


When two or more systems are integrated, input/output controls must be reviewed by the IS auditor in the: A. systems receiving the output of other systems. B. systems sending output to other systems. C. systems sending and receiving data. D. interfaces between the two systems.

1 Answers  


Which of the following components of a business continuity plan is PRIMARILY the responsibility of an organization?s IS department? A. Developing the business continuity plan B. Selecting and approving the strategy for business continuity plan C. Declaring a disaster D. Restoring the IS systems and data after a disaster

1 Answers  


An IS auditor performing a review of the IS department discovers that formal project approval procedures do not exist. In the absence of these procedures the IS manager has been arbitrarily approving projects that can be completed in a short duration and referring other more complicated projects to higher levels of management for approval. The IS auditor should recommend as a FIRST course of action that: A. users participate in the review and approval process. B. formal approval procedures be adopted and documented. C. projects be referred to appropriate levels of management for approval. D. the IS manager's job description be changed to include approval authority.

2 Answers  


Which of the following would be included in an IS strategic plan?

7 Answers   Deloitte,






Which of the following ensures completeness and accuracy of accumulated data? A. Processing control procedures B. Data file control procedures C. Output controls D. Application controls

1 Answers  


Antivirus software should be used as a: A. detective control. B. preventive control. C. corrective control. D. compensating control.

1 Answers  


Which of the following exposures associated with the spooling of sensitive reports for offline printing would an IS auditor consider to be the MOST serious? A. Sensitive data can be read by operators. B. Data can be amended without authorization. C. Unauthorized report copies can be printed. D. Output can be lost in the event of system failure.

2 Answers  


The responsibility, authority and accountability of the IS audit function is documented appropriately in an audit charter and MUST be: A. approved by the highest level of management. B. approved by audit department management. C. approved by user department management. D. changed every year before commencement of IS audits.

1 Answers  


To prevent an organization's computer systems from becoming part of a distributed denial-of-service attack, IP packets containing addresses that are listed as unroutable can be isolated by: A. establishing outbound traffic filtering. B. enabling broadcast blocking. C. limiting allowable services. D. network performance monitoring.

1 Answers  


The BEST time to perform a control self-assessment involving line management, line staff and the audit department is at the time of: A. compliance testing. B. the preliminary survey. C. substantive testing. D. the preparation of the audit report.

1 Answers  


E-mail message authenticity and confidentiality is BEST achieved by signing the message using the: A. sender's private key and encrypting the message using the receiver's public key. B. sender's public key and encrypting the message using the receiver's private key. C. the receiver's private key and encrypting the message using the sender's public key. D. the receiver's public key and encrypting the message using the sender's private key.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)