A can have a piece of work done in 8 days,B can ork three
times faster than A,C can work five times faster than A.how
many days will they take to do the work together?
Answer / mr. perfect
A & B together do the piece of work together in 4 days.
Whereas all together do the work in 2.28 days....
| Is This Answer Correct ? | 0 Yes | 0 No |
I have cleared sbi clerk and have interview in 26/04/2010.But I am M.Ed & B.Ed,i want to u know my answed about not chose the teaching post
What is Curency of Somalia
NIC Exam Pattern?? Where it will be available..
where v get the models for the gate exam?& for apptitude test ?
4. Human code is a 1) error correcting code 2) lossless source code 3) lossy source code 4) error detecting code
i live in water, if you cut my head i am your door,if you cut my tail i am a fruit,if you cut both then i am with u.who am i?
Why voltage drops in star connected motor And how IL=ph
The horse has played a little known but very important role in the field of medicine. Horses were injected with toxins of diseases until their blood built up immunities. Then a serum was made from their blood.Serums to fight with diphtheria and tetanus were developed this way. It can be inferred from the passage, that horses were (A) given immunity to diseases (B) generally quite immune to diseases (C) given medicines to fight toxins (D) given diphtheria and tetanus serums
What are the most asked questions for learner operators in the interview for eskom?
voltage ratings of HT and LT power cables
THE usable band width of a microwave transponder for 6/4 GHZ satellite communication is generally is.........
how to prepare for bcil bitp