rom 7am to 11am it rained 2.25 inches.at 11am the rain
increased to fall at rate oh 1.25inches every 2 hours.how
many inches of rain landed on the ground by 5pm
Answers were Sorted based on User's Feedback
Answer / ramyashree
7-11=2.25
11-1=2.25+1.25=3.50
1-3=3.50+1.25=4.75
3-5=4.75+1.25=6
ans is 6 inches
Is This Answer Correct ? | 22 Yes | 2 No |
Answer / saps
7-11=2.25inch
11-1=2.25+1.25inch
1-3=1.25*2
3-5=1.25*3
total 12 inches
Is This Answer Correct ? | 8 Yes | 8 No |
A hollow cube of size 5cm is taken , with the thickness of 1cm . it is made of smaller cubes of size 1cm . if the outer surface of the cube is painted how many faces of the smaller cubes remain unpainted?
8 Answers Accenture, CTS, TCS,
X and Y live in a North-South parallel street. X travels 10 km towards North to reach the east-west street . Y travels 6 km towards south to reach the east ?west street . X travels now 4km towards east and y travels 8km towards west and they met each other. What is the distance between x and y?
distance D=rt where r & t are +ve and r is constant,as t increases then D_________
A car travels a certain distance taking 7 hrs in forward journey, during the return journey increased speed 12km/hr takes the times 5 hrs.What is the distance travelled Options Are : 10Kms 20Kms 30Kms 40Kms
Light glows for every 13 seconds . How many times did it between 1:57:58 and 3:20:47 am
What would be the simple interest obtained on an amount of Rs. 5580 at the rate of 6.5 % p.a. after 5 years?
When x is real what is the least value of (x**2-6*x+5)/(x**2+2*x+1)
4 Answers Geometric Software, GSSL,
600 to be seated.10benches are less.so 2 more persons are required to be seated in each bench.so how many benches. 209 36 44 60
what is the sum of 7 consecutive odd numbers with 27 as the fourth number
Ramesh and his grandfather differ in their ages by 60 years. After 5 years, if the sum of their ages will be hundred years, what is the present age of Ramesh?
9 Answers HCL, SSC, XYZ Corporation,
what is your approach to working under pressure?
There is a work which can be completed by A with 12 days and B by 18 days. A and B works together for 3 days and B left. After that how many days for A to complete the work?