Hi, We have have the major losses between BBT ( Bus Bar Trunking) to LT Incomer & LT to HT incomer, how to arrive the losses?
1 3843why in scott connection of transformers, main transformer is tapped at 50% and teaser transformer at 86.6%?
5 33701Sir if i have 2kv ups in which 17ah 8 battries load 600watts how much back up time i get and if i put 6kv ups with the same no of battries same amp can i get more back up time please give reply exactly what is the procedure to calculate back up time for different kv,s
3 6776write encoder 17 pins details? pin a;b+, pin b;w+,..pin s & t. what is the meaning of b+, w+? explain;
2152Post New Electrical Engineering Questions
what is a types of short circuit and what is a types of distance protection tests
i want to learn control schedule for 11kv panel? can any one send the detailed control schedule?
Work done in a free expansion process is
What are the material used for inductance coil?
How to determine alternating current frequency?
Define end float in a motor?
What is the permissable nutral current of three phase system as per IS standards?
what happen if the supply is given to the stator of the 3phase induction motor with out assembling the rotor ?
what is V.L.F. testing of power cable? do you know the voltage ratings, like for what rating and size of cable what rating of V.L.F. testing is used?
Explain Even and Odd signals?
what is inter connected dc generator?
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
what is die electric strnth of transformer ?
hello friend i wish to study a course related to the electrical construction, controlling and monitoring , which course i want to study? pls give me the name of institute?
During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.