IBM AS400 AllOther (736) wat is scan and check ? give me real time scenarios where we used these keywords in ur projects?
2 11910i'm working on progA , in that program i want to see the userids of the users who work on this program?
10 17407how to see all source files in a particular library? ex:xyz is a library name a,b,and c..... are source files how to see?
13 32739How can we access Interactive job LDA in Batch Job?. and How we can access a file in interactive QTEMP lib in Batch job?.
IBM,
4 234121) How to retrieve RRN through RPG ? 2) How to pass parameter by value ? 3) How to trap the error through the RPG/400
10 33034
Can we debug the MSGW JOBS?
In Which Specs Arrays, Tables & Constants Are Defined?
Apart from opening of a file do we have any other use of USROPN?
what are the limitations of cl (compare to rpg) ?
when would you use or not use this approach?
what would be the effect on the field where reverse image, underline and highlight display attributes were active?
how can database records be read without lock ?
When we have a file with Duplicate records and I want to read the unique record from the file. For example a file containing Emp Name as 'Ram' and there are 3 entries of it. So how to read a unique record from File?
what are the different types of data areas?
what is the purpose of data structure?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
Define redefine?
Write a logic program for knowing the repeated number of a vowels in a given program?
are there any useful c runtime apis that I can call from rpg iv?
what is the procedure and explain about real time scenario.