Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

3i Infotech General Aptitude Interview Questions
Questions Answers Views Company eMail

If PQRST is a parallelogram what it the ratio of triangle PQS & parallelogram PQRST

5 29889

There are 6 red shoes & 4 green shoes . If two of red shoes are drawn what is the probability of getting red shoes

4 19332

A person wants to buy 3 paise and 5 paise stamps costing exactly one rupee. If he buys which of the following number of stamps. he wont able to buy 3 paise stamps

6 14120

The price of a product is reduced by 30% . By what percentage should it be increased to make it 100%

7 27938

There are two candles of equal lengths and of different thickness. The thicker one lasts of six hours. The thinner 2 hours less than the thicker one. Ramesh lights the two candles at the same time. When he went to bed he saw the thicker one is twice the length of the thinner one. How long ago did Ramesh light the two candles .

25 61200

Perimeter of the back wheel = 9 feet, front wheel = 7 feet on a certain distance, the front wheel gets 10 revolutions more than the back wheel .What is the distance?

8 29138

There are two circles, one circle is inscribed and another circle is circumscribed over a square. What is the ratio of area of inner to outer circle?

3 28952

A man leaves office daily at 7pm. A driver with car comes from his home to pick him from office and bring back home. One day he gets free at 5:30 and instead of waiting for driver he starts walking towards home. In the way he meets the car and returns home on car He reaches home 20 minutes earlier than usual. In how much time does the man reach home usually?

7 27771

No of financial emergency announced by president

2053

If m/n=6/5 then 3m+2n=?

5 9262

Perimeter of front wheel =30, back wheel = 20. If front wheel revolves 240 times. How many revolutions will the back wheel take?

4 39265

City A's population is 68000, decreasing at a rate of 80 people per year. City B having population 42000 is increasing at a rate of 120 people per year. In how many years both the cities will have same population?

7 11031

A contract is to paint 3 houses. Mr brown takes 6 days to paint a house. Mr black takes 8 days and Mr blue 12 days. Mr brown leaves for a vacation after 8 days. Mr black works for 6 days from then.How many days would Mr blue require to complete the contract?

5 8647

A worker is paid Rs.20/- for a full days work. He works 1,1/3,2/3,1/8.3/4 days in a week. What is the total amount paid for that worker ?

1 1765

Each side of a rectangle is increased by 100% .By what percentage does the area increase?

662

Post New 3i Infotech General Aptitude Interview Questions


3i Infotech General Aptitude Interview Questions


Un-Answered Questions

u having experience of more than 2 yeras in marketing so why u want to join bpo?

1986


What is mvc? Mvc architecture of iphone app.

439


You work for a large manufacturing plant. You're working on a new project for an overseas product release. This is the company's first experience in the overseas market, and they hope to make a big splash with the introduction of this product. The project entails producing your product in a concentrated formula and packaging it in smaller containers than the U.S. product uses. A new machine is needed in order to mix the first set of ingredients in the concentrated formula. Which of the following is true? A. The new machine, the concentrated formula, and the smaller package are each project constraints. B. The new machine, the concentrated formula, and the smaller package description must be incorporated into the product description document. C. The new machine, the concentrated formula, and the smaller package are each project assumptions. D. The new machine, the concentrated formula, and the smaller package are each considered deliverables.

683


Emergency Shutdown Systems/ Plant Shutdown System.

1742


Tell me why the shape of op-amp is triangular not other shape?

3169






You've constructed the WBS for your recent project. Level two assignments have been made, and you've requested that the sub project manager’s report back to you in 3 weeks with each of their individual WBS constructed. All of the following are true except: A. The work package level facilitates resource assignments. B. The work package level is the lowest level in the WBS. C. The work package level defines the agreed-upon deliverables. D. The work package level facilitates cost and time estimates. ?

601


Give me the code of in-order recursive and non-recursive.

872


Mention what are the techniques available in delivery scheduling?

662


Explain leaky bucket algorithm and compare it with token bucket algorithm.

2060


What is primary key in ms access 2007?

439


What is the purpose of hssfcolor class in apache poi?

5


How do I find the start menu?

481


What happens if no xml namespace declaration is in scope?

485


What are dynamic loading?

545


here's one of our insurance plans. Sell it to me? : insurance cold calling

400