How much quantity of steel will be used for commercial building consists of ground floor shops, first floor shops, second floor will be for offices and third floor will be office/banks. How many tons of steel is required to construct this building.
3 6228Post New CRPF Civil Engineering Interview Questions
Which property is used to check whether a DataReader is closed or opened?
How do I get rid of negative zeros in excel?
Amplitude modulation is basically a A Summing of two signals B Multiplication of two signals C Subtraction of two signals D Non-linear process
Which is the largest kangaroo in the world?
What are Session states available and its Uses?
please let me know about the versant round...
Overlapping and splitting, where do you assign?
What does “READ SQL DATA” do?
What are the criteria need to be followed for an aircraft to be longitudinal statically stable?
You do not expect the types of variances that have occurred on the project to date to continue. If BAC = 300, ETC = 275, PV= 300, AC = 200, EV = 250, and CPI = 1.25, what is the EAC? A. 240 B. 250 C. 475 D. 150
Let’s say we have to update the same record in after trigger context. Is there any way or workaround?
Explain what are components of reportnet?
What is postgis and postgresql?
What is parallel and local currency in sap?
What is function (in details) room sensor and tube or coil sensor in HVAC system?