Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

Wipro Interview Questions
Questions Answers Views Company eMail

1/8 Is divided by 's' , if 's' is increased by 2 times, what Will be the result.

1329

1,40,00,000 pencils are put up straight. all the pencils are of length range 3 to 6 inches. 80% of the pencils have average of five inches. so the find out the total length spanned by the penciles.

701

2 is what % of 4t ?

758

6 people A,B,C,D,E and F sit around a table for dinner. Since A does not like C, he doesn't sit either opposite or beside C.B and F always like to sit opposite each other. If A is beside F then who is are the two neighbours of B?

1615

9 laboures can complete the construction of a wall in 18 days. How many less days will 12 laboures take to complete the same wall?

1 3106

A certain type of mixture is prepared by mixing brand A at Rs.9 a kg. with brand B at Rs.4 a kg. If the mixture is worth Rs.7 a kg., how many kgs. brand A are needed to make 40kgs. of the mixture?

1047

A person travels 12 km in the southward direction and then travels 5km to the right and then travels 15km toward the right and finally travels 5km towards the east, how far is he from his starting place?

756

A person travels 6km towards west, then travels 5km towards north ,then finally travels 6km towards west. Where is he with respect to his starting position?

807

A person was fined for exceeding the speed limit by 10 km/hr. Another person was also fined for exceeding the same speed limit by twice the same. If the second person was traveling at a speed of 35km/hr,find the speed limit?

803

A sum 's' is divided into 4 parts. Second person gets Rs 10 more than first.3rd person is Rs 10 more than second, 4th is 10 more than 3rd. How much amount do 1st person get?

907

A team P of 20 engineers can complete a task in 32 days. Another team Q of 16 engineers can complete the same task in 30 days. Then the ratio of working capacity of 1 member of P to that of a member of Q is:

1053

A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.

1048

A>B,B>C,C=D,D>E,then which is greatest?

858

After spending 2/3 of his salary on rent and food items and 1/4th of the remaining on transportation, Rajesh has 6000 with him. How much did he pay on transportation?

1741

Area of triangle=(1/2)*b*h base increased by 4 times & height is divided by 2, the net effect of area?

854

Post New Wipro Interview Questions


Wipro Interview Questions


Un-Answered Questions

What are the values associated with multi columns?

258


What is a good powerpoint font?

99


Draw Sequence Modal of RDO? Explain.

1617


What are the difference between CT/PT operated Meter and RRAMR Meter for HT/LT application?

2014


What is localhost in mysql?

531






What is a static class in java?

552


What do you know about internationalization? How will you implement internationalization in angularjs?

418


What can I delete from windows 10 to free up space?

408


With the formula Frequency=(np)/120 were does the 120 come from I realize it to be a constant but how was it determined

2630


I want to know about P.G courses &details

1666


what is groups and and ledgers in tally can you give why we need to prepare them

2079


Do you know about Appraisal process?

742


How to retrive a student with height marks,second height and third height from MS access database what wil be the query for this purpuse?

561


What is a serial queue?

455


Given a Pid, how will you distinguish whether it is a process or a thread?

603