what are different types of alternator and discuss about the methods of cooling

16 69204

In UDP protocal Iam sending one immage i lost one packet in network how can i refill that packet on receving side,how can i deside total immage is receved ?

1964

what are the application or secification (temp/presure)for which IBR pipes should be used?

1724

WHAT IS EASY & PERFECT METHOD TO JOIN CONVEYOR BELTSEXPLAIN IN DETAIL

4 11099

Why the cost of CT increases with the decreasing of its CT Ratio (Technical Reason)?

2 5040

where do we connect tap of tap changer, to H.V. side or L.V.side? and why?

5 12869

A man loses 20% of his money and after spending 70% of the remainder he is left with Rs. 270. Originally he had

15 50333

What is the difference between Pressure Safety Valve and Pressure Relieve Valve, in what condition we prefer choose Pressure Safety Valve rather than Pressure Relieve Valve? and vice versa

2 12986

what is the difference between gsm and cdma??

2 5488

How wti of transformer works?

5 25344

i want to know that how the height of Ct ,cvt ,LA calculated on the basis of creepage distance

2049

control modes

1 4905

while calculating the power absorbed by a resistor connected to the output of a half wave rectifier circuit should we use rms or average current? explain with reason.

1 2769

can we say current flows inside an atom as electron moves inside an atom?

7 8164

why there is no current in the rotor body althrough the flux linking with it also get changes. why current only flows in windinds not in rotor

1 4561

Post New Vedanta Interview Questions




Un-Answered Questions

Why there is actually a need for the businesses to invest in a rdbms tool in the present time? : hana administration

47


Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

6481


How do you manage cancelled goods issue for an order in scm process?

124


If null and 0 are equivalent as null pointer constants, which should I use?

574


What is the function performed by code generator in hibernate?

203






Explain the difference between a semi-precious and a precious stone?

424


What are the difference between alert() and confirm()?

454


Explain the advantages of inheritance.

670


What is the architecture of ios?

450


What is the mceliece cryptosystem?

477


How to Define a Procedure in RPG?

1220


What are the different tables(engine) present in mysql, which one is default?

508


Explain what are the different types of transformation available in informatica.

567


What is struts-default package and what are it’s benefits?

573


describe an achievement highlighting your approach to a problem you faced as well as the solution you developed

6076