Given the following code, what is the value of RESULT?

DName+++++++++++ETDsFrom+++To/L+++IDc.Keywords+++++++++++++
D RESULT S 5 0

C EVAL RESULT = (2 + 3 * 2) ** 2 / 2

Answer Posted / anuj

Agreed.. Should be 32.. see below

1. RESULT = (2 + 3 * 2) ** 2 / 2
2. RESULT = (8) ** 2 / 2
3. RESULT = 64 / 2 = 32.

Thanks.

Is This Answer Correct ?    17 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the key words you must use when using a subfile?

686


How to select highest score of each subject or how to select highest income of every month?

1293


what was the robotech rpg?

680


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

762


what is kids-rpg?

661






what is the necessary keyword needed to scroll subfile records?

695


Program to read marks of 10 students for 4 subjects and compute and display total marks and status of each student in rpg

712


1.Load an runtime array of length 99 from the pf and you want to handle all the possible errors?

2367


can you debug ile rpg program using isdb?

734


what is data area and how it is used in rpg program ?

752


Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.

2045


How to call one program from another program in RPG? please help me with the code

1256


what is the procedure and explain about real time scenario.

1473


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1756


What is ment by record level identifier?

647