What is dunning? What is dunning level..? How many dunning
levels can be configured?
Answer Posted / venkat
dunning is nothing but remainder to the customer or
vendor.When you customize dunning you have to create
dunning area like at what level you want to use the
dunning,like business area level or company code level.
Afer that you have to make settings for dunning procedure,
in that you have to define no of due dates and no of
dunning levels. there are minimum 4 and maximum 9 levels
are there.
| Is This Answer Correct ? | 13 Yes | 6 No |
Post New Answer View All Answers
i want to check whether the particular cost center is assigned to which Controlling cycle.
What is known as year shift/displacement in a fiscal year?
What is a fiscal year variant ?
please send to me product costing fags. my email id abburi.bhaskar@gmail.com
What are the 3 errors that you must have faced during Support?
Is there any additional configuration required for account-based profitability analysis as compared to costing based profitability analysis?
What is a resource in co? : co- cost center accounting
What are the different scenarios under which a business area or a profit center may be defined?
What is allocation price variance? : co- cost center accounting
What is posting period variants?
When do you use special period?
Assign different no. range for different business area of same co. code.
Explain the process of calculating the planned activity output through long term planning?
explain 2 business scenarios which do you feel have considerable significance and what kind of solutions did you offer while working on the projects?
How do you configure check deposit?