should we include risk in Test Plan
Answer Posted / umesh
Yes,we should bcoz there should be always a backup plan in
ur project management
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Describe some staff conflicts you have handled.
Explain the components of a test plan?
Are there more defects in the design phase or in the coding phase?
If anyone have attended interview with deloitte for the post of senior manual test engineer. Please share the interview process and the questions asked. How to prepare for the interview. Thanks in advance
Is an "A fast database retrieval rate" a testable requirement?
Is anybody have the telecom systems test cases from start to end?
How soon the bug should get fixed?
1) Test summary contains ? 2) Requirement Tracebility means ? 3) Test Effort contains ? 4) Test Planning Productivity ? 5) Metrics should be caluclated ? 6) Interest rate Rsik is a type ? 7) Test analysis and Design process task? 8) secured loan is a part of Liability (or) assest in a balance sheet? 9) Money Market means? 10) a ------ specifies all of the terms of a loan and the obligations borrower ? 11) what is a primary market is ? 12) Quality of Testing measure with ? 13) Company has a share with facevalue 10 rs/- and NAV of 37 after comapny has given Dividend of 35 % then How much NAV become ? ( I don't know what is NAV means, question overall Idea I am giving not 100% perfect ) the potions for these are 1) 33 2) 33.50 3) 37 4) 42 14) one compay has taken 10 million loan from a bank for a Interest rate is 10 % and base amount is 0.4% so how much they had paid monthly Emi ? they provideansews like 1) 100000 2) 114000 3) 140000 4) 104000 Remaing questions I not remember.
What is verification in software testing?
What r the features,u take care in prototype testing?
What is date driven testing?
What are tools of performance testing?
What is desk checking and control flow analysis
What is ofx testing?
Can you explain regression testing and confirmation testing?