What is interaction or interface bet PP with FICO and PP with SD
Answer Posted / freejo
Integration with PP-SD is the
requirement class and the requirement type. These are
defined in the Planning startergy of PP and Requirement
type of SD. Additionally the SCh lines also play a major
role.
Is This Answer Correct ? | 9 Yes | 6 No |
Post New Answer View All Answers
What is pi sheet
Tell some standard order types and what configure done for current project
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
Define ‘bom group’?
What is internal payroll process?
What is scope of planning?
List out the basic procedure for dispatching operations in capacity leveling?
Mention what is the difference between stock transport order and stock transfer order?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
How is the processing time calculated in a wc when both labor, machine categories exist?
What is the difference between pp and pp-pi? Which one is better and how ?
What is mrp group and what is the use of it?
What is meant by slab?
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
Difference between byproduct and co-product.