What is interaction or interface bet PP with FICO and PP with SD

Answer Posted / freejo

Integration with PP-SD is the
requirement class and the requirement type. These are
defined in the Planning startergy of PP and Requirement
type of SD. Additionally the SCh lines also play a major
role.

Is This Answer Correct ?    9 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is pi sheet

2112


Tell some standard order types and what configure done for current project

1538


any one can provide me some sample resume for SAP PP with 0 to 1 year experience?

3543


Define ‘bom group’?

607


What is internal payroll process?

601






What is scope of planning?

1020


List out the basic procedure for dispatching operations in capacity leveling?

613


Mention what is the difference between stock transport order and stock transfer order?

619


What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?

724


How is the processing time calculated in a wc when both labor, machine categories exist?

647


What is the difference between pp and pp-pi? Which one is better and how ?

817


What is mrp group and what is the use of it?

616


What is meant by slab?

583


How requirements( pir,sles order, customer requirement) are reduced after they are produced?

611


Difference between byproduct and co-product.

1105