Answer Posted / ramendra verma
In Repitative Manufacturing.we dont have make the BOM
frequently.The change in production process is less.It is
Quantity based planing.Material back flushing is after the
process run.
Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
What is MRP group?
Can we create production order without bom and routing ?
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
What is alternative BOM, or diff between BOM group and Group BOM?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
How can I use variable size items?
What is meant by slab?
What is Inspection Points?
What are the levels of batch, explain batch determination process?
How to create object dependencies in a bom for a configurable material?
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
Mention what are the production process in sap?
Consignment matl how will be use
What are the key fields in MRP views?
Difference between different strategy groups.