Answer Posted / ramendra verma
In Repitative Manufacturing.we dont have make the BOM
frequently.The change in production process is less.It is
Quantity based planing.Material back flushing is after the
process run.
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
What is the use of plm (product lifecycle management) in sap pp?
SPRO path for order, confirmation or requirement class.
What is group bom?
Are there any reports in sap to list of material requirement from ltp ?
Consignment matl how will be use
Do you have any idea about Capacity Planning?
What is plm (product lifecycle management) in sap pp?
What is SOP and types of SOP?
What is MTS and MTO and the difference between them?
What is the standard info set?
What is the use of t-code cs20 in bom?
what are the constraints of Variant configuration?
What is Planning time Fence?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
You want to integrate pp with fico. What steps would you take?