Answer Posted / ramendra verma
In Repitative Manufacturing.we dont have make the BOM
frequently.The change in production process is less.It is
Quantity based planing.Material back flushing is after the
process run.
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
What is scheduling
In lsmw which is the most important step?
What are all the steps involved in Variant Configuration?
What is qualification deficiency?
Control keys
What is meaning of customized reports?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
Explain the gaps and the steps involved in them.
Explain Flexible Planning procedure or How many levels of Flexible planning.
What are the MRP master data?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Explain schedule margin key
What is testing & explain standard testing
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
After doing realization how we will check whether it is working or not?