Answer Posted / mohammed
There are many different types of MRP methods in SAP.
1.Forecast based Planning(VV), 2.Re-order point level
planning(VM), 3.plan of unplanned material(PD), 4.no
planning(ND). What MRP type is applicable for Planning of
material can be selected in Material Masters to determine in
MRP procedures.
Lot sizing procedure is defined in the material master
record so that the sap system automatically determines
calculation of material in the planning runs
Ex:Static lot size,optimizing and Period lot sizes
Ex:whether the order qty needs to be calculated exact lot
size, rounding qty, or Min lot size, Max lot size which
needs to be set in master master record for planning
Is This Answer Correct ? | 19 Yes | 4 No |
Post New Answer View All Answers
What is the sequence of determining the vendor : quota arrangement, source list, pir, old po. Arrange them in right sequence.
How do we create a client in the mm module?
How will you map subcontracting process for project stock?
How can you disable a reservation in mrp?
What are some of the other erp applications available in the market?
How to delete a batch?
Differentiate between bsx and bsa
What is a cost center?
How do you post the goods if the po number is not known?
What is an 'mrp area'?
What do the xd01 do?
Mention what are the types of special stock available?
What information does consignment info record contain?
What do the we 103 do?
What is the use of ‘info update’ indicator in purchasing documents?