adspace
Answer Posted / mohammed
There are many different types of MRP methods in SAP.
1.Forecast based Planning(VV), 2.Re-order point level
planning(VM), 3.plan of unplanned material(PD), 4.no
planning(ND). What MRP type is applicable for Planning of
material can be selected in Material Masters to determine in
MRP procedures.
Lot sizing procedure is defined in the material master
record so that the sap system automatically determines
calculation of material in the planning runs
Ex:Static lot size,optimizing and Period lot sizes
Ex:whether the order qty needs to be calculated exact lot
size, rounding qty, or Min lot size, Max lot size which
needs to be set in master master record for planning
| Is This Answer Correct ? | 19 Yes | 4 No |
Post New Answer View All Answers
what is scheme group field and confirmation control keys in vendor master?
what are the uses of reference purchase organization?
Please suggest ME which institute is best for sap mm and kindly let me know which institute Mr.Syed Quarish is working and his contact no? and who is expert in teaching test scrips and CIN
what is inventory valuation pls Explain in detail?
Any good instructor in Noida for SAP MM ? There are lots of fake institute in Noida like Aptorn, Rector IT, Skyinfotech, etc. I have already been cheated by Aptron. Now searching any instructor who actually help to make my carrier in SAP MM Domain. If someone has any idea, pls inform me at 9811960753.
what is the difference between valuation class and valuation category ?