The differnt types of planning procedures are
1. MPS - Master Production Scheduling
2. MRP - Material Reuquirements planning
3. Consumption based planning - (there are two types)
i) Forecast based planning
ii) Reorder point planning
a) Manual Reoderpoint planning
b) Automatic reorderpoint planning
| Is This Answer Correct ? | 55 Yes | 16 No |
Post New Answer View All Answers
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What are the t-codes for creating, changing and summarizing bom?
What is requirement class and requirement type?
List out the basic procedure for dispatching operations in capacity leveling?
What is group bom?
What is a ‘bom’?
Why and how you calculate WIP?
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
What is mrp controller means?
Scheduling times can be defined in the material master record by?
How can I use variable size items?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
How do you integrate HR (employee) with PP?
What is the use of t-code cs20 in bom?