if i have three programs progA,progB and progC .now i call
progB from progA. but the progB does not exist . now i want
to call progC instead of starting dump. how can we achieve
this.

Answer Posted / ali

only one option to use checkobj after call command

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to call one program from another program in RPG? please help me with the code

1245


how do I declare a minor?

702


When it is desirable to describe files Internally?

1177


1.Load an runtime array of length 99 from the pf and you want to handle all the possible errors?

2355


which program rpg or cl is efficent to update a transaction onto a database file and why ?

727






during execution, an rpg/400 program automatically follows a sequence of operations for each record that is processed. The built-in program cycle includes the following logical steps.

745


how do I declare a table or array in rpg iv?

722


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1748


write an RPG program to calculate the marks of 5 students (A,B, C, D, E)in 3 different subjects (eng, math, sci) an display on the screen

818


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

750


what is *place and *auto keyword in prtf ?plz explain

2706


How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

1550


How to handle duplicate error handling in RPG?

1660


What is a record lock error?

1250


explain sflclr, sflend, sfldlt, and sflcsrrrn?

874