how many tasks are there in informatica ?
Answer Posted / purva
Tasks in Informatica can be categorized as,
1. Assignment Task
2. Command Task
3. Control
4. Decision
5. Email
6. Event-Raise
7. Event- Wait
8. Session
9. Timer
| Is This Answer Correct ? | 74 Yes | 5 No |
Post New Answer View All Answers
Why filter transformation is an active one?
What are the informatica performance improvement tips
suppose we are using dynamic lookup cache and in lookup condition the record is succeeded but in target it is failed due to some reasons then what happened in the cache ?
Can we create multiple integration service on single repository?
What is substr in informatica?
What are the different lookup cache(s)?
How do you manage the Parameter files while migrating your data from one environment to another environment?
I have three same source structure tables. But, I want to load into single target table. How do I do this? Explain in detail through mapping flow.
What is status code in informatica?
What is the need of etl tools?
How do you load unique records into one target table and duplicate records into a different target table?
How do you load alternate records into different tables through mapping flow?
Under what conditions selecting sorted input in aggregator will still not boost session performance?
How will the document be delivered to me?
What is an Integration service in Informatica?