Answer Posted / v.ramachandran
# Master Production Schedule
# Material Requirement Planning
# Consumption Based Planning
Automatic reorder level planning
Manual Reorder Planning
| Is This Answer Correct ? | 44 Yes | 14 No |
Post New Answer View All Answers
Steps to configure Production order type.
What is mrp group and what is the use of it?
Explain Planning file entry.
What is activity type and how it works in costing?
What is 'capacity planning'?
Integration between PP and SD module.
What is a ‘routing’ in pp?
What are the t-codes for creating, changing and summarizing bom?
Difference between base unit of measure, production unit, order unit
What is the use of QM control key?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What is meant by payscale structure? How did you configure the payscale structure?
What is the Difference between TECO and CLSD?
Integration between PP and MM Module.
Mention what are the production process in sap?