A man walks from 9.15 to 5.15 from monday to friday and 9.00
to 12.00 on saturday.Each day 0.45 min lunch.
How much time he walks in a week
Answer Posted / coolguy
41 Hrs 35 Mins
Monday to Friday 8 * 5 = 40 HRs - 2 Hrs 25 Mins
Sat - 3 HRS
| Is This Answer Correct ? | 0 Yes | 6 No |
Post New Answer View All Answers
A man is running around a rectangle it takes time 2 time in travelling length than travelling width total perimeter = 300. Find area.
Some statements are given below: � L says all of my other four friends have money � M says that P said that exactly one among them has money � N says that L said that precisely two among them have money � O says that M said that three of the others have money � P, L and N said that they have money All the above statement are false.. Who has money & who doesn't have any money?
A hotel has two,the east wing and the west wing.some east wing rooms but not all have an ocean view(OV).All WW have a harbour view(HV).The charge for all rooms is identical, except as follows * Extra charge for all HV rooms on or above the 3rd floor * Extra charge for all OV rooms except those without balcony * Extra charge for some HV rooms on the first two floor&some EW rooms without OV but having kitchen facilities.
Complete the series 1 6 3 7 5 8 7 ?
Integral ET(epsiolan transpose)*sigma*dV P=strain displacement vector Q=stress-strain deformation Find [K]
if on a salary of rs."S" per month,one has to pay one tax of x rs. And a second type of tax of y rs then % of salary taken home is?
The diameter of a circle is 21 metres. It will take how many revolutions to cover a distance of 6.6 km?
X and Y are partners in a business. X invests 300 for 12 months and Y invested 600 for 6 months. If they gain a profit of 700 at the end of one year, what is X's share?
During a given week A programmer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
In a box there are four different coloured bells,of some quantity (4 each ) what is the minimum number of pick ups so that, atleast 2 of them of the same colour.
A man can row downstream at a rate of 14 kmpl & upstream at 9 kmpl. Find man's rate in still water ?
One fast typist type some matter in 2hr and another slow typist type the same matter in 3hr. If both do combinedly in how much time they will finish.
Ramesh working alone on a job takes 12 days more than what he would have taken if Suresh had worked along with him while Suresh working alone on the same job takes 27 days more than what he would have taken if Ramesh had worked along with him. Find the time that both of them would take together to do the job.
2 is what % of 4t ?