Product Costing Run is over. Now If I add one more
rawmaterial for that material also it has to included & run
the cost. But it is not happening?
Answer Posted / gopid123
Its Simple u have to do CKR1 and again CK11n then CK24
| Is This Answer Correct ? | 19 Yes | 1 No |
Post New Answer View All Answers
You want to insert an inspection check point at the end of an operation. How would you do that?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
Define gaps.
Explain how the pp module is organized in sap?
What is meaning of customized reports?
Define mrp group
What is the internal recruitment?
What is collective order. Pre requisite of the collective order?
How to attach a drawing for a material to bom ? Is it possible ?
What is Schedule Margin key. How floats works in scheduling?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
What are the parameters are there in Order type or in dependent para. config?
Checkdigit example
Explain Flexible Planning procedure or How many levels of Flexible planning.
What is meant by slab?