Answer Posted / padmas
The software development model SDLC is known as water-fall model in which various stages as Requirements, Analysis and Design, Coding, Testing and Maintenance and Release, during each stage the requirements are carefully studied and carried out to next develop stages, of its design and code implement as said in the requirements. Initially the requirements are high, and in the subsequent stages the gathering of requirement will be slowly decreases and development of design code increases, in such a way that water falls from top to bottom stages. The flow of requirements slowly decreases at the last stage of the bottom of development as being to deliver to the client. So the reason it is known as water fall model sometimes.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
when Delivery Consultant job will start in a project?
in SW development who will be the owner of the perticular requirement and what is his responsibilities
what do .sbl and .sbh represent?
disk swapping is a feature used in
how to track the requirements if all ready it is available for that product
what is meant by business rules ?
I have COG-132, COG-112 Latest Dec-2009 dump. If anybody need these dumps. Please send me a mail to certcert2009@gmail.com.
Write an email to the client when your project is going to be released but unfortunately many major bugs are found and your lead is absent on that day, now you are the leader of the group and you have to release the build.
HI Friends. this is balu. I am looking for testing job in chennai. If u know anything regarding job information. pls send a mail to me kool.balu@gmail.com
what is the defference between test specification and test plan?
Q1. Write a Defect report if 99 th row of the spread sheet crashes?
I am sonakshi did MBA in marketing and then SAP sd certification now i am unable to get job yet i have around 2 years of domain ex. what to do?
what are the major differences in requirement when compared among SW project requirement and Product requirement
how to manage the requirement if it is included after Requirement specifications phase
in your organization in what way(phases) s/w is developed and in what way testing will be conducted?