how much quantity of blocks, cement and sand is required to
complete 1sq.m of CC Hollow blockwork. Size-16"x8"x8". Also
what is the cement sand ration commonly used?
Answer Posted / betonaloka
Do you want to see the consumption of cement in each building block on the beton aloka site?
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
psc girder detail
What Are The Different Type Of Slump Test Indications?
Will going from a 3-tap to 6-tap increase water pressure?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
in plate load test what is the thickness of plate 20mm 5mm 50mm none
What are the responsibilities of a construction manager?
How to testing voids of filled aggregate in bitumen mix design
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
how much tempareture are required to make liquid state of pid leed
what are the values of compressieve strenght?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
During reclamation how can the occurrence of mud waves can be rectified?
Basic civil interview questionsÂ
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?