how do you use commitment control in rpg program ?
Answer Posted / satyanarayan singh
Using COMIT operation. Makes all changes to the files that have been specified in output operation since the previous COMIT or the begining of operations under commitment control(if there has been no previous COMIT or ROLBK operation).
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the version of os/400 that we have?
what is the difference between seton lr and retrn?
can a indexed file be accessed in arrival sequence in rpg program?
what is the purpose of data structure?
if dspatr(pc) and csrloc were specified for a format, which keyword would have priority?
how do you read data area in an rpg program?
describe the difference between the dowxx and douxx operations?
How to reverse a string using RPG?
How to reverse the string in rpg
difference between view and index ?
How to convert a spool file to PDF file in AS400?
what is the purpose of ovrdta (override data) keyword?
What is program status data structure(psds) in as400?
What is file information data structure(infds) in as400?
what is the length of a variable in rpg?