A box consists of 12 poles and 7 pices of nets totally
weighing 1.75pounds. If each pole weighs .07 pound and each
piece of net weighs .12 pounds. What is the weight of empty box
Answer Posted / padma
0.07
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
On Monday a manufacturer processed a batch of bats, on Tuesday he processed three times as many, and on Wednesday he processed 4000 bats. In the three days, He processed 16000 bats. How many did he process on Tuesday?
if a=2, b=3, c=6 Find the value of c/(a+b)-(a+b)/c
The average salary of Ram, Shyam and Sundar is 95 Rs. per week. If Ram earns Rs.115 and Shyam earns Rs.65.What is the salary of Sundar.
Given 10 alphabets out of which 5 are to be chosen. How many words can be made with atleast one repetition.
The day before yesterday was WEDNESDAY then the day after 2morrow is?
Difference between the perimeters of two concentric circles is 66. Find the difference between radius.
maths
There is a safe with a 5 digit number as the key. The 4th digit is 4 greater than second digit, while 3rd digit is 3 less than 2nd digit. The 1st digit is thrice the last digit. There are 3 pairs whose sum is 11. Find the number.
If f(0)=1 and f(n)= f(n-1)*n, find the value of f(4).
Find the speed of the boat in still water if the river runs at 4 km/hr. The time taken by a Suresh to row the boat upstream is 3 as the time taken by him to row it downstream.
There are 12 boys and 15 girls, How many different dancing groups can be formed with 2 boys and 3 girls. Which of the following fractions is less than 1/3?
On BRIC So called New york has risen by on average sales plese chewk the incorrect sentence option 1. so called 2. Has risen 3. By on average
A simple interest amount of Rs 6000 for 6 months is Rs 600. Calculate the annual rate of interest.
Average of 5 number is -10 sum of 3 numbers is 16,what is the average of other two numbers?
Himesh works thrice as much as Bhavin. Find the number of days it would take to complete the work if both work together if Himesh takes 60 days less than Bhavin to do a work.