what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.
Answer Posted / rafiya
In book it is mentioned that 1in 30 means for 30 m wide road the crown will be 0.5 m above the edge of the road
| Is This Answer Correct ? | 26 Yes | 10 No |
Post New Answer View All Answers
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
What materials were used to build the golden gate bridge?
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
How do you measure water flowing through 300mm diameter pipes?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
what is pile and deam foundation
What will you do if you encounter problems like accidents?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
how to calculate MR 9(derivation)
Explain what is structural frames or systems?
The largest size of paper used in plotter to print the drawing made by Autocad .
What are the applications of cad?
What is zoning permit?