what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.

Answer Posted / rafiya

In book it is mentioned that 1in 30 means for 30 m wide road the crown will be 0.5 m above the edge of the road

Is This Answer Correct ?    24 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much required strength of cement concrete bricks(size 230x115x75mm)

1569


What type of tensile strength is handling by crank in beam? Thanks.

2037


what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?

2624


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

1728


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

2385






How to calculate carrying capacity of the existing water supply trunkmain

1801


What things architect have to take care of before starting any project?

738


What is the snap size in civil and how can we create it?

2304


.5Ast

1337


What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?

1969


What is the strongest bridge for a school contest?

706


detailed calculation of the amount of cement used?

1621


what is mean by reestimation?

1350


What is the difference between yeild strength and compressive strength of steel???

1780


why are you joining in this (applied post) job and your aim for this job

2115