Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why attemperation is required in HRSG in a combined cycle
power plant?

Answer Posted / santosh dhange

attemparation used to Control the Temperature of Super heater, to work within the design parameter.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3260


How do you consider that you can improve and what assistance do you need to achieve this

1761


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1750


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

2440


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1712


can dp type level transmitter work in under vaccum condition

1991


what does mean by kva rating

1521


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1704


What is LB-SR.

3016


LAPT working in alternator / generator

3636


what is the trip circuit supervision in an electrical meaning?

2134


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2496


what is the basic use of power plant in equipment

1764


Why superheated are started before I'd and rd fan?

2187


What is difference between secondary Air & Tertiary Air and Their use.?

2010