I have two plants one is in india and another one is
uk,both plants are have same vendor,and same purchase
organisation.you can maintain different caleculation schema
for both plants?
Answer Posted / jagpal
Yes you can do it. But company code PIR should be different for both plant.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What do you mean by subcontracting?
If price in purchase info records is maintained as zero or not maintained for a certain period and we make a po for the same period but price is populated in po. Where does the price come from?
How is the inventory management integrated with mm?
Which documents are used as references when we create po?
Difference between planned delivery time and gr processing time?
What are various procedures for counting physical inventory?
Problem is that after goods receipt and after invoice verification, a reversal of goods receipt is being done. The client wants this more controlled as the grir account is being affected. So no reversals to be done after invoice verification. How to approach this?
hello guys, could you tell me the few difficult tickets that you have solved in SAP MM??
Mention what is the transaction code used to extend the material view?
How to determine the vendor in pr automatically?
Mention what are the major purchasing tables? List the transaction codes for them?
What is goods movement? What type of documents is created after the goods movement?
If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?
What are the categories of purchasing information records?
What is goods receipt & goods issue?