Method of findingthe dry ingredient quantity of 1 m3
concrete.
Answer Posted / tarique08
suppose, concrete mix ratio = 1:1.5:3
then, sum = 1 1.5 3 = 5.5
as we know,dry material required for 1 cum. of concrete =
1.54 cum.
then we can find -:
(1) cement = 1*1.54/5.5 = .28 cum. or .28cum.* 28.8= 8.06
bags.
(2) sand = 1.5* 1.54/5.5 = .42 cum.
or .42cum.* 35.3 = 14.83 cubic feet.
(3) coarse aggregate = 3* 1.54/5.5 = .84 cum.
or .84 cum.* 35.3 = 29.65 cubic feet.
so, dry ingredient quantity required for 1 m3 of concrete-:
cement = 8.06 bags.
sand = 14.83 cft.
coarse aggregate = 29.65 cft.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
why does the most of civil engg is not intersted to going for teaching field?
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
What are the uses of alloys in daily life and how are alloys made?
Explain how you can turn off the display for dimension in CAD?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
Time required for curing of wall tiles before fixing
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
Why do you want to work here
How to find beam R/F cutting length
Define mirror?
how we check the thickness and line of ceiling plaster.
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
what are the five benefits of using standard terminology in the measurement process?
how to calculate reinforcment in staircase cranked beam?