Is it weather conditions make any problems to the
electrical equipments and if yes means is it any
precautions needed?
Answer Posted / aditya199307@gmail.com
For weather condition protection we will use various thing for indoor machines there is no need but for outdoor ie:-
for transformer we use LA
For motor & Generator we use Canopy
In summer time we use cooling arrangement for substation for CT & PT units.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Advantages/Disadvantages of earthing of neutral bus on MSB instead of separate neutral earthing for transformer/DG sets feeding to MSB
how can i use REF and diffrencial relay both in 1 CT core for transformer protection?
what is the defination of Cable database? What are the points are considered while preparing cable database? Is there any sample available for cable database?
Draw the wave shape of armature current in a generator subjected to a sudden three phase short- circuit at its terminals. Define various reactance of generator from this wave shape.
How they LT panel busbar size choose
In case of HV test on medium voltage cables, BS is asking for 4 U0 where as IEC is asking for 3.5 U0. Can any one advise me how this 3.5 times or 4 times U0 is derived?
We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?
What is the ideal position cooling fan inside the dc motor?
What is the function of attenuator in cro?
how can found motors folt current ? how can disided circuit breakers caoicity and breaking capicity ?
how to calculate the surge level of surge suppressors related to the SF6 cicuit breakers?
why and where we use early make & late break contacts in protection?
We have studied about many techniques for finding the stability of system, ROOT LOCUS, ROUTH, BODE PLOT, POLER PLOT etc. In these which is used where. what are the difference among them... PLZ tell me.......
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB Machines of higher rating?