Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Need a sql query: retrive all duplicate records in table

Answer Posted / sbakshi4

File name : FLNM
Field name : FLD

Query :
SELECT FLD ,COUNT(*) FROM FLNM GROUP BY FLD HAVING COUNT(*) > 1

This will give the field values repeatation with the number of times it is been duplicated.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is difference between bind by copy and bind by reference?

2466


what is data area and how it is used in rpg program ?

1317


what is *place and *auto keyword in prtf ?plz explain

3154


What is the difference between iter and do?

1204


How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

2008


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

1242


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

2248


if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.

2623


during execution, an rpg/400 program automatically follows a sequence of operations for each record that is processed. The built-in program cycle includes the following logical steps.

1219


Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?

936


what is the procedure and explain about real time scenario.

1950


What are the types of identifiers?

1015


how can I tell when to replace the array?

1206


What is ment by record level identifier?

1135


How would display prime numbers using CL program?

6311