how many datamarts we will use in real time project and when
will use the datamart?pls send the replay early

Answer Posted / madhu tallapaneni

For example: dB every branch have each mgr

Manager
Reliance comm.

Reliance Group : manager Top Level mgr(TLM)
Reliance power details of below
sales
Manager customer
Reliance Fresh TLM needs employee
period
` order
Input

Explanation of above example: Reliance group with some there branches and every branch have one manager. And for all this manager one Top level manager (TLM) will be there. And TLM needs the details of list shown above for analyze.
Bottom level
For above example how ETL process is done shown below RC-mgr
reliance fresh ERP
mini WH/ Data mart DWH independent Data Mart Dependent Data Mart Reliance Fresh(taking one from group directly)

Dependent Data Mart: means the ETL process takes all manager information or dB and keep in the Warehouse. By that the data transmission between warehouse and data mart where depends upon by each other. Here Data mart is also called as ‘Bottom level’/ ‘mini WH’ as shown in blue color in above figure i.e., the data of individual manager (like RF, RC, RP and so on). Hence the data mart depends up on the WH is called dependent data mart.

Independent Data Mart: only one or individual manager i.e., data mart were directly access the ETL process with out any help of Warehouse. That’s why its called independent data mart.

6.1 Two level approaches:
For the both approaches two layers architecture will apply.
1. Top-Bottom level approach, and
2. Bottom- Top level approach.

6.1. Top – Bottom level approach:
The level start from top means as per example Reliance group to their individual managers their ETL process from their to Data Warehouse (top level) and from their to all separate data marts (bottom level).
R Comm. Data Mart


R Power Data Mart
Reliance Group
Warehouse
R Fresh Data Mart

Top level Bottom level

Layer I Layer II

Top – Bottom level approach
In the above the top – bottom level is defined, and this approach is invented by W. H. Inner.
Here, warehouse is top level and all data mart are bottom level as shown in the above figure.

6.2. Bottom – top level approach:
Means from here the ETL process takes directly from data mart (DM) and the data put in the warehouse for reference purpose or storing the DM in the Data WareHouse (DWH).



R comm.
DM
R power
DM DWH
Reliance Group
R fresh DM

Layer I Layer II Bottom level Top level

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between account and directory options ?

618


What is developer responsibilities in UAT (user acceptance testing and Post implementation phase?

1633


What is ibm datastage?

601


How can one find bugs in job sequence?

780


Difference between ‘validated ok’ and ‘compiled’ in data stage?

663






if i have two tables table1 table2 1a 1a,b,c,d 1b 2a,b,c,d,e 1c 1d 2a 2b 2c 2d 2e how can i get data as same as in tables? how can i implement scd typ1 and type2 in both server and in parallel? field1 field2 field3 suresh , 10,324 , 355 , 1234 ram , 23,456 , 450 , 456 balu ,40,346,23 , 275, 5678 how to remove the duplicate rows,inthe fields?

1743


Name the command line functions to import and export the DS jobs?

699


Enlist various types of routines in datastage.

639


What are the features of datastage flow designer?

629


table actions available in oracle connector?

1084


How to reverse the string using unix?

2793


im new to this tool im now at project plz tell me step by step process how to design plz help me i wnt to go with exp for job plz give me d proper design and explination

1625


What are the different kinds of views available in a datastage director?

596


Differentiate between odbc and drs stage?

591


How to implement complex jobs in data stage?

611