Why attemperation is required in HRSG in a combined cycle
power plant?
Answer Posted / murali
for control steam temp and to avoid secondary super heater coil metal temp high. becoz secondary coil location is near flue gas out from gas turbine. this gas temp around 620 degree Celsius
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How do you consider that you can improve and what assistance do you need to achieve this
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
By any way can we increase the B check hours from 300 to 500
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
What is difference between secondary Air & Tertiary Air and Their use.?
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
How We Calibrate the vaccum transmitter?
why do you consider yourself a suitable candidate for this position
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
what is the meaning of SST300 V56A in SIEMENS turbine
what is the basic use of power plant in equipment
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
what is restricted earth fault explain in details