Thirty men take 20 days to complete a job working 9 hours a
day. How many hour a day should 40 men work to complete the job?
(a) 8 hrs
(b) 7 1/2 hrs
(c) 7 hrs
(d) 9 hrs
Answer Posted / aishu
30*9=40*t2
270/40=t2
ANS:6.75
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
If 8 men are required to complete a work in 6 days, how many men will be required to complete the same work in ½ day?
Find the reminder when 333666777888999 divided by 3 or 9 or 11 ?
HERE = COMES – SHE, (Assume s = 8), Find value of R + H + O
What number comes next 10, 9, 60, 90, 70 and 66?
What is your objeective in career ?
consider expression 'ab' . what happens when 'a' is divided by 'c' &'b' is multiplied by 'c'.
a radioactive material of mass 16 grms in 10 years due to radiation. how many years will it take for the material to attain a mass f 1 gm
Olympic race : 4 contestants : Alan,charlie, Darren ,Brain. There are two races and average is taken to decide the winner.one person comes at the same position in both the race. Charlie always come before darren. Brian comes first once. Alan comes third at least once. Find the positions. Alan never comes last. Charlie & darren comes 2nd at least once.
present ages of sameer and anand are in the ratio of 5 : 4 respectively. Three years hence, the ratio of their ages will become 11 : 9 respectively. What is anand's present age in years?
Complete the series 2, 7, 24, 77,__ (hint: 2*12= 24, 7*11= 77, therefore 24*10= 240)
gavaskar average in first 50 innings was 50 . after the 51st innings his average was 51 how many runs he made in the 51st innings
If INDIA = JOEJB then BSNZ =?
5 women given some of their heights(tall,medium,short)Hair( long, plainted),stards(Black or Brown), sari,2 medium,2-short.Tall-no sari.Plainted-medium.Answer the combinations.
What is the difference between control module
Time and speed time and work boat and streams