In A,B,C are having some marbles with each of them. A has giben B and C the same number of
marbles they already have to each of them. then, B gave C and A the same no. of marbles they have,
then C gave A and B the same no. of marbles they have. At the end A,B,and C have equal no. of
marbles.
(i) If x,y,z are the marbles initially with A,B,C respectively. then the no of marbles B have at the
end
(a) 2(x-y-z) (b) 4(x-y-z) etc.
(ii)If the total no. of marbles are 72, then the no. of marbles with A at the starting
a. 20 b. 30 c. 32
Answer Posted / manoj k l
total no of marbles=72
at the end all are having equal no of marbles i.e.,each having 24.
calculate from bottom:
A B C
39 21 12 (A gave 21 to B and 12 to C)
6 42 24 (B gave 6 to A and 12 to C)
12 12 48 ( c gave 12 to A and 12 to B)
24 24 24
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Convert the decimal number 310 to the base 6.
There is a safe with a 5 digit number as the key. The 4th digit is 4 greater than second digit, while 3rd digit is 3 less than 2nd digit. The 1st digit is thrice the last digit. There are 3 pairs whose sum is 11. Find the number.
A fold density is 19 times greater than the water and for copper it is 9 times.At what ratio you can mix gold and copper to get 15 times denser than water.
Hi friends i am new to this site. Pls provide me the KVB clerical exam model question papers. pls send to mail id mailstoaaa@gmail.com. Hope u guys will help me.
How many rational numbers are there between 0 & 5?
Asmita invests an amount of Rs. 9535 at the rate of 4 per cent per annum to obtain a total amount of Rs. 11442 on simple interest after a certain period. For how many years did she invest the amount to obtain the total sum?
2 persons can finish a job in 8 days. First person alone can finish the work in 24 days. How many days does the second person take to finish the job?
if 2 miles of fence enclose a square plot of 160 acres,how large a square will 4 miles of fence
How can you make a square from two triangles?
Complete the series. 4, -5, 11, -14, 22, ---
If A=Z, B=Y, C=X, .......... Z=A, Then SOUR = ?
Asian paints takes a contracts to paint 3 houses. Mr. White can paint a house in 6 days while Mr.Blue would take 8 days and Mr.Red 12 days. After 8 days Mr.White goes on a holiday and Mr. Blue begins to work for a period of 6 days. How many days will it take Mr.Red to complete the work?
A sequence is given. You should find out error & write correct 1 2 5 10 13 26 29 48.
The area of the maximum size of the circle described from the 10 square inch square?
new town is straight to the north of new york. A high way m runs from newtown making an angle of 61 degree south east. From new york there is also an high way n which runs northeast 61 degrees. If high ways m and n are straight then find out the acute angle made at their intersection point.